How the 4 on 4 off pattern works
With days and nights the cycle lasts 16 days: four day shifts, four days off, four night shifts and four days off. Four shift teams, each starting four days after the one before, keep one team on days and one on nights every day of the year. On the days-only pattern the cycle lasts 8 days and two teams cover the days.
Because the cycle is 8 or 16 days long, it moves through the week: your blocks start on a different weekday each time, and weekends off come round at irregular intervals. The calendar shows at a glance when your next free weekend is.
Shift times vary from site to site, for example 7am to 7pm and 7pm to 7am. The calendar does not depend on the times, but the hours in the summary assume 12-hour shifts.
How to find your shift team
Look at your current rota for the next day you start a block, on days or on nights, enter it above and say whether that block is days or nights. Whether your employer calls the teams A to D, red, blue, green and white or something else makes no difference: the teams only differ in the day their cycle starts.
Then share the link with your team. Everyone can enter their own start date, and the link keeps the setting.
Pros and cons
Four days off after every block give you real time to recover, travel or see family, and you never work more than four 12-hour shifts in a row. Four days off come round every eight days, so short breaks are possible without using annual leave, even when they fall midweek.
On the other hand, 12-hour shifts are long, and switching from days to nights means resetting your sleep every cycle. Birthdays, Christmas and bank holidays often fall on a shift, so it helps to check them in the calendar well in advance.
Working hours and rest
Under the Working Time Regulations most workers cannot be made to work more than 48 hours a week on average, normally averaged over 17 weeks, and are entitled to 11 hours' rest between working days. With 12-hour shifts a 4 on 4 off rota averages 42 hours a week, below that limit.
Your employer's rota and your contract always come first. This calendar is a planning aid.